Engineering, Development, and Installation, Installation
Client
PT. KAI DAOP 2 BD
Completion Year
2014
Project Highlight
Improving Train Detection Through Reliable Track Insulation
Insulated Rail Joint (IRJ) are essential components of railway signaling systems, providing electrical isolation between track sections to enable accurate train detection and safe signal operation. Proper installation is critical to maintaining signaling integrity, minimizing electrical interference, and ensuring long-term operational reliability.
Project Detail
Project Overview
PT Tri Lintang Mandiri successfully carried out the installation of prototype Insulated Rail Joints (IRJ) at Bandung Station and Andir Station. The project was undertaken to validate the performance and integration of IRJ within the existing railway signaling infrastructure, supporting reliable train detection and safe railway operations.
Scope of Work
Site assessment and installation planning
Installation of Insulated Rail Joint (IRJ)
Track preparation and alignment
Integration with the existing signaling system
Functional testing and performance verification
Technical evaluation of the installed IRJ
Project Highlights
Location: Bandung Station and Andir Station, West Java, Indonesia
Service: Engineering, Installation and Testing
System: Insulated Rail Joint (IRJ)
Application: Electrical Track Isolation for Train Detection
Project Status: Successfully Completed
Project Outcome
The successful installation and evaluation of the prototype Insulated Rail Joint demonstrated reliable electrical isolation and compatibility with the existing signaling infrastructure. The project contributed valuable operational data while supporting accurate train detection and reinforcing the safety and reliability of railway signaling systems at both stations.
Project Gallery
Empowering railway infrastructure through specialized signaling engineering, delivering safe, reliable, and future-ready solutions for every stage of your project.