Project Overview
PT Tri Lintang Mandiri successfully carried out the test and commissioning of the refurbished AC Track Circuit system at Jakarta Kota Station. Following the refurbishment, case relocation, and installation activities, our team verified equipment functionality, validated system integration, and confirmed that the signaling system met technical and operational requirements before returning to service.
Scope of Work
-
Functional testing of refurbished AC Track Circuit equipment
-
Verification of electrical wiring and signaling interfaces
-
Validation of relocated Track Circuit equipment case
-
System integration testing with the existing signaling infrastructure
-
Operational performance verification
-
Test and commissioning for operational readiness
Project Highlights
-
Location: Jakarta Kota Station, Jakarta, Indonesia
-
Service: Test and Commissioning
-
System: AC Track Circuit
-
Application: Railway Train Detection System
-
Project Status: Successfully Completed
Project Outcome
The successful completion of the test and commissioning process confirmed that the refurbished AC Track Circuit system operated in accordance with technical and operational requirements. Through comprehensive functional testing and system validation, PT Tri Lintang Mandiri ensured reliable train detection and restored the signaling system to support the safe and efficient movement of railway traffic at one of Indonesia’s busiest historic stations.