Get a Quote

Edit Template

Test & Commissioning

We provide comprehensive test and commissioning services to verify that railway signaling systems operate safely, reliably, and in full compliance with technical and operational requirements before entering service.

Our Test & Commissioning Capabilities

We conduct functional testing, system integration verification, equipment validation, and operational commissioning for railway signaling and telecommunications systems, ensuring every installation is ready for safe commercial operation.

Functional System Testing

Verify the performance and functionality of signaling equipment to ensure compliance with engineering specifications and operational requirements.

System Integration Verification

Validate communication and interoperability between signaling equipment, train detection systems, point machines, and control systems.

Operational Commissioning

Execute commissioning procedures to confirm that newly installed or upgraded systems are fully operational and ready for railway service.

Performance Evaluation & Acceptance Testing

Conduct final inspections, performance validation, and acceptance testing to support successful project handover and long-term system reliability.

Why Choose Us

Delivering Confidence Before Every System Goes Live

Our experienced engineers follow structured testing methodologies to verify safety, reliability, and system performance, ensuring every signaling system is ready for dependable railway operations.

Featured Projects

Palembang LRT Test and Commissioning

Ensuring Operational Readiness for Indonesia's First Light Rail Transit System. The Palembang Light Rail Transit (LRT) was developed as Indonesia's first modern LRT system to improve urban mobility and support the successful hosting of the 2018 Asian Games. With a 23.4-kilometer route connecting Sultan Mahmud Badaruddin II International Airport and Jakabaring Sport City, the project required a highly reliable signaling system to ensure safe and efficient railway operations.

Lemah Abang – Cikampek Axle Counter Test and Commissioning

Validating Modern Train Detection for Safe Railway Operations. The modernization of the Lemah Abang–Cikampek railway corridor included the deployment of the Siemens Axle Counter system to replace conventional DC Track Circuit technology. Before entering operational service, the newly installed signaling system required comprehensive testing and commissioning to ensure every component functioned safely, reliably, and in accordance with railway signaling standards.

Filter Module Installation Cibungur Station – Banjar Station Test and Commissioning

Verifying Reliable Lightning Protection for Railway Signaling Systems. Axle Counter Filter Modules play a critical role in protecting railway signaling systems from lightning-induced electrical disturbances. Following installation, comprehensive testing and commissioning are essential to verify system performance, ensure proper integration, and confirm reliable protection of train detection equipment under operational conditions.

Jakarta Kota Station Track Circuit AC Refurbishment Test and Commissioning

Validating Refurbished Train Detection Systems for Reliable Railway Operations. Following the refurbishment of an AC Track Circuit system, comprehensive testing and commissioning are essential to verify equipment functionality, confirm system integration, and ensure reliable train detection. These activities help restore operational performance while maintaining the safety and reliability of railway signaling infrastructure.

Insulated Rail Joint (IRJ) Test and Commissioning

Verifying Electrical Isolation for Reliable Train Detection. Insulated Rail Joint (IRJ) is a critical component of railway signaling systems, providing electrical isolation between track sections to enable accurate train detection and safe signal operation. Following installation, thorough testing and commissioning are essential to verify electrical integrity, system compatibility, and reliable performance under operational conditions.

Double Wheel Detector Test and Commissioning

Verifying Reliable Performance of Refurbished Train Detection Equipment. Double Wheel Detector (DWD) are essential components of axle counter systems, accurately detecting train wheel passages to ensure safe train detection and signaling operations. Following refurbishment, comprehensive testing and commissioning are critical to validate equipment performance, operational accuracy, and seamless integration with the railway signaling system.

Empowering railway infrastructure through specialized signaling engineering, delivering safe, reliable, and future-ready solutions for every stage of your project.

© 2026 PT. Tri Lintang Mandiri

Get In Touch